Frequently Asked Questions
TKPOA CMT Project FAQs
CMT YEAR 2 FUNDING REFERENDUM
What was completed during Year 1 of the CMT?
What is the design for Year 2 of the CMT?
What are the Group B methods?
Will there be boating restrictions in Years 2 and 3?
What is the CMT Year 2 budget?
How is the $1.1M Year 2 budget being spent?
What is the Mitigation Fund?
How does the Project Team plan to stay on budget in Year 2?
Are the herbicides effective?
Why are there still weeds in some herbicide treatment sites?
Why should we continue with the CMT?
What is the design for Year 3 of the CMT?
Will we be utilizing the circulation system to improve water quality?
Has the TKPOA Board of Directors made a decision to reactivate the circulation system?
What is the Tahoe Regional Planning Agency (TRPA) and the League to Save Lake Tahoe (Keep Tahoe Blue) partnership contributing?
TKPOA CMT Project FAQs
CMT OVERVIEW
The CMT permit requires that water be flowing into the Keys from the lake during the herbicide application period. When does this normally occur? When does water typically start flowing out of the Keys into Lake Tahoe?
Why not test the entire Keys right now?
How do you decide on which lagoons/areas to test?
Are the herbicides safe for humans, pets, and wildlife?
There was mention that 10% of the area of the Keys Lagoons area is being tested. Is that percentage just for herbicides?
What is the best source of information on the Control Methods Test?
Is this the only test or will there be more?
In future, will the application of herbicide require similar restrictions?
What does the future look like for treatment of invasive weeds and deteriorating water quality?
Will we be evaluating the effectiveness of the areas treated with UV-C light last summer?
For UV-C treatment, does that require shutting down waterways at all?
Is the herbicide being used at full strength?